Current Position:Home > QualityControl
 
   Quality Control
Project Control
Process Flow
Mould Maintenance
Mould Maintenance

Tool Maintenance
1. SunOn prefers mould tool maintenance on a three month cycle.
2. In each cycle the tool is carefully inspected and the quality is assured.

·The mould is retrieved from storage.
·The mould is opened.
·The rust prevention oil is completely removed.
·The tool surface is cleaned and any rust is removed.
·If necessary, the mould surface will be polished to return the tool to pristine condition.
·Quality control reviews the tool and makes a record of the maintenance.
·If the tool is to be used make a production, it is moved to and loaded in the injection equipment.
·If the tool is to be returned to storage, then a layer of rust prevention is applied.
·The tool is closed the maintenance tag is updated and moved to storage.
Group information  
Sun On (Head Quarters)

Sun Hui (Dong Guan Subsidiary)

Chuang Xin Hui(Shen Zhen Subsidiary)

Letop Printing(Dong Guan Subsidiary)

Sun On(Hui Zhou Subsidiary)
 
 
Copyright © Sun On Enterprises Group Ltd(HK)
Factory Add: No.88, Hongying Industrial Park,Hongshi Bridge,Fenggang Town,Dongguan City,Guangdong Province ,China
TEL:86-0769-82622606 FAX:86-0769-82060122 E-mail: info@sunon-mfg.com